RAG 132
Proposal
Part 1 :
Objective:
1 . To beautify the HBP area
2 . To develop the HBP area
3 . To make the HBP area more convenient to all people

Place:
The area between the E47-E48 building and the E15 building.
Node and Path:
The first node is the E47-E48 building.
Another node is E15 building.
The path is the non-develop land between the E47-E48 building and E15 building.
Problems:
1. That area is a quite dangerous place. The reasons is:
~ There is no any post light there, and it is too dark there.
~ There are so many students always pass through the area, means that there are a lot of people are using the path way there.
~ There are also a lot of students walk through there at night, as they are going to studio to finish their studio work.
~ It is not so convenient if there is no any post light there.
~ Recently there are too many rap cases happening in the campus area. People can be easily attacked by other there.
2. The area is neither a recreation place nor a develop place. It is quite a waste if we leave the place as a non-develop area or a vacant land.
~There is no any warning board or dangerous sign board there.
~There is no any fence there.
~People will easily fall down the slope.
Improvement:
1. For the first problem, we should add some post lights there. This will lighten that area and make that area not so dark.
2. For the second problem, we should develop that area by build a pool, plants some plants, some trees, some flowers there.
3. For the third problem, we should build a fence and place some warning board or dangerous sign board there.
Advantages:
~ Can make the HBP area safer.
~ Can beautify the HBP area.
~ Can provide a recreation place to let HBP students and staffs relaxing there.
~ Can apply the sustainable development concept on that area.
The target of the improvement is HPB students, HBP staffs and HBP lecturers. Of course, the other faculties or other courses students also can go there to have a relaxing time.
Part 2:
“Zero” cost of the project:
We cannot use any of our money to do this project, so we have to get the money from HBP or get some sponsor to complete our project.
How can we get the material and where did we get the materials?
We get all of those materials around USM. Some of the materials come from the HBP area and some from the construction area. All those materials is the materials that are already thrown by the construction workers. Therefore, all the materials are the recycle materials, and the 3-R concept can be fulfilled.
How to do the 1M plate?
1. First, we measure 1M x 1M on a big board, and we cut it off using a saw, which we lend it from the workshop which located in HBP.
2. After that, we measure the length of the plate and cut off four sticks to do the beam of the plate.
3. Then, we cut off two more sticks and make a ‘X’ cross beam at the back side of the plate to make it more stable.
4. We do the other 5 plates by repeating the step 1-step 3.
No comments:
Post a Comment